Question: 1) An activity relationship chart is shown below for a manufacturing facility along with the space requirements for each department. a. Construct a relationship diagram.

1) An activity relationship chart is shown below
1) An activity relationship chart is shown below for a manufacturing facility along with the space requirements for each department. a. Construct a relationship diagram. b. Design the corresponding block layout diagram. Space Combined Relationships sq. m. (Flow and Other/Service) 40 x 30 12001 Cut Code REASON 40 x 20 800 2 Treat 1 Flow of Material 40 x 20 800 3 Sub Assembly 2 Ease of Supervision 40 x 30 1200 Final Assembly 3 Convenience 4 Production Control 40 x 20 800 Storage incl. Rec. & Ship 5 Dust & Fumes 20 x 20 400 Test 6 Material Control 20 x 20 400 Office incl. Services 5600 Total in Square Meters 29

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!