Question: 1 . Compare pre - stressing with reinforced concrete technology. You may refer to the stress diagrams above whenever necessary. 2 . Explain the difference

1. Compare pre-stressing with reinforced concrete technology. You may refer to the stress
diagrams above whenever necessary.
2. Explain the difference between pre-tensioned and post-tensioned concrete and describe the
methods to construct each.
3. You are about to construct a 9m long and 4.8 m wide pre-tensioned concrete slab for a
commercial construction project.
a) Draw the layout of a casting bed including the tendon arrangement, reinforcement and
accessories.
b) Describe QA and QC process including preparation and during and after construction.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!