 1. Consider two new wells A and B producing for 3

1. Consider two new wells A and B producing for 3 months according to the parameters shown below. Assume single-phase oil flow. For both wells A and B:rw=0.5ft, production rate q=500STB/D Oil viscosity =2cp,B=1.2Rb/STB Porosity =0.2,K=300md,h=100ft,Ct=50e61/psi There is an observation point (OBS) located mid-way between the two wells. a. Estimate the pressure drop at the OBS b. Estimate the velocity underground at the OBS