Question: 1. Draw the project network & verify its consistency. 2. Ignoring the resource requirements; determine the Total Project Completion Time, Critical Path and Slack time


0 m The manufacturing of flight hardware fabrication & testing of a flight-propolsion system List of the main activities of this project, duration & two resources (workers&machines) required Activity Immediate Time Required (weeks) Resources Predecessor P worker: machines 0 1 2 4 5 B 1 1 1 6 1 B 1 3 3 D 1 1 1 1 4 E D 2 3 4 2 3 F 2 3 1 6 G F 1 1 1 4 6 H 5 10 15 1 3 I H 1 2 3 4 2 J I 2 3 4 3 1 K J 8 10 4 3 L K 5 10 15 1 6 M K 4 6 8 1 1 N K 2 4 6 2 1 O K 2 3 4 1 1 P L 2 3 4 2 5 M 2 3 4 5 2 R N 1 2 3 1 3 S O 2 3 4 2 T P.Q.RS 1 1 1 U 1 3 4 3 Sheet1 3 4 H 3 U V W 4 1 1 2 2 2 1 4 2 1 4 4 3 6 6 XY Z AA BB T, CC 6 V W X Y Z AA BB DD EE FF GG HH II JJ KK LL MM NN 00 PP QQ RR SS TT 5 1 4 3 4 3 3 8 1 4 1 1 3 6 15 3 3 1 3 3 7 3 1 2 1 1 1 2 5 1 1 1 1 1 3 1 1 1 2 1 1 1 2 3 5 1 3 1 1 2 4 10 2 2 1 2 2 5 1 1 1 4. 2. 2 2 3 5 EE FF GG HH II JJ LL MM NN DD 00, PP QQ RR G, SS 1 5 1 2 3 2 1 3 4 4. 4 3 6 6 3 2 1 6 1 1 1 6 3 3 1 2 1 4 1 4 3 1 2 3 1 1 1 2 2 5 4 7 1 1 TT UU VV GSS TT UU 3 2 3 5 6 4 7 10 5 1 2 1 5 2 in Requirements: 1. Draw the project Network & verify its consistency 2. Ignoring the resource requirements, determine the Total Project Completion Time, Critical Path and Slack time for all activities involved 2. What will be the probability that the project will be completed in 42 weeks, 52 weeks & 46 weeks? 3. If the worker & machine cost per hour are $20 & $50, respectively, Determine the cost of eachactivity 4. Assume that he maximum number of workers that can be employed at any time is 36, and the maximum number of machines on hand is 10. Determine a feasible schedule of the activities such that the project duration is minimized. 5. Determine the total project cost based on the schedule developed in part "4." 0 m The manufacturing of flight hardware fabrication & testing of a flight-propolsion system List of the main activities of this project, duration & two resources (workers&machines) required Activity Immediate Time Required (weeks) Resources Predecessor P worker: machines 0 1 2 4 5 B 1 1 1 6 1 B 1 3 3 D 1 1 1 1 4 E D 2 3 4 2 3 F 2 3 1 6 G F 1 1 1 4 6 H 5 10 15 1 3 I H 1 2 3 4 2 J I 2 3 4 3 1 K J 8 10 4 3 L K 5 10 15 1 6 M K 4 6 8 1 1 N K 2 4 6 2 1 O K 2 3 4 1 1 P L 2 3 4 2 5 M 2 3 4 5 2 R N 1 2 3 1 3 S O 2 3 4 2 T P.Q.RS 1 1 1 U 1 3 4 3 Sheet1 3 4 H 3 U V W 4 1 1 2 2 2 1 4 2 1 4 4 3 6 6 XY Z AA BB T, CC 6 V W X Y Z AA BB DD EE FF GG HH II JJ KK LL MM NN 00 PP QQ RR SS TT 5 1 4 3 4 3 3 8 1 4 1 1 3 6 15 3 3 1 3 3 7 3 1 2 1 1 1 2 5 1 1 1 1 1 3 1 1 1 2 1 1 1 2 3 5 1 3 1 1 2 4 10 2 2 1 2 2 5 1 1 1 4. 2. 2 2 3 5 EE FF GG HH II JJ LL MM NN DD 00, PP QQ RR G, SS 1 5 1 2 3 2 1 3 4 4. 4 3 6 6 3 2 1 6 1 1 1 6 3 3 1 2 1 4 1 4 3 1 2 3 1 1 1 2 2 5 4 7 1 1 TT UU VV GSS TT UU 3 2 3 5 6 4 7 10 5 1 2 1 5 2 in Requirements: 1. Draw the project Network & verify its consistency 2. Ignoring the resource requirements, determine the Total Project Completion Time, Critical Path and Slack time for all activities involved 2. What will be the probability that the project will be completed in 42 weeks, 52 weeks & 46 weeks? 3. If the worker & machine cost per hour are $20 & $50, respectively, Determine the cost of eachactivity 4. Assume that he maximum number of workers that can be employed at any time is 36, and the maximum number of machines on hand is 10. Determine a feasible schedule of the activities such that the project duration is minimized. 5. Determine the total project cost based on the schedule developed in part "4
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts