Question: 1) Evaluate the attached time study sheet. All data in the W column are times that have been gathered using a continuous stopwatch method. All

 1) Evaluate the attached time study sheet. All data in theW column are times that have been gathered using a continuous stopwatch

1) Evaluate the attached time study sheet. All data in the W column are times that have been gathered using a continuous stopwatch method. All times are in minutes, tenths of minutes and hundredths of minutes. Please answer on the time study sheet where possible. a) What are the normal times for each element? b) What are the standard times for each element? c) What is the standard time for one cycle of this job? d) Based on the data for Element 2 how many work cycles are needed if you would like at least 95% confidence that your estimated value is within +/- 6% of the true value of the normal time for this element. Date: of Page Observer: Time Study Observation Form Study No Operation: 21 Element No. and Description 3 Operator: 4 L EZ E3 E4 Note Cycle RWOTNT RWONT RWOTNT St = 0.00 1 2 3 RWOT NTR WOT NT RWOT! NT 46 129 190/84 208 32 4550 70 193 190413 532 1737 190158 972 99 | 100915 161 86 951103 liss 318 185 9281 dioid) 17 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Summary Total OT Rating 100 110 125 Total NT No. Observations Average NT % Allowance Elemental No. Occurences Standard Time Total Standard Time (sum standard time for all elements): Foreign Elements Time Check H:M:S Allowance Summary Sym w W2 OT Description Finishing Time 8:11:45.6 Personal Needs 5 532 710 Left to get drink Starting Time 18:00:00.0 Basic Fatigue 2 B Elapsed Time 11:45.6 Variable Fatigue TEBS Special 2 D TEAF o Total Allowance % E Total Check Time Remarks: F Effective Time Time started at 00:00 G Ineffective Time Rating Check Total Recorded Time hundredths of mirates Synthetic Time Unaccounted Time % Observed Time Recording Error % Time in minutes, touths 1) Evaluate the attached time study sheet. All data in the W column are times that have been gathered using a continuous stopwatch method. All times are in minutes, tenths of minutes and hundredths of minutes. Please answer on the time study sheet where possible. a) What are the normal times for each element? b) What are the standard times for each element? c) What is the standard time for one cycle of this job? d) Based on the data for Element 2 how many work cycles are needed if you would like at least 95% confidence that your estimated value is within +/- 6% of the true value of the normal time for this element. Date: of Page Observer: Time Study Observation Form Study No Operation: 21 Element No. and Description 3 Operator: 4 L EZ E3 E4 Note Cycle RWOTNT RWONT RWOTNT St = 0.00 1 2 3 RWOT NTR WOT NT RWOT! NT 46 129 190/84 208 32 4550 70 193 190413 532 1737 190158 972 99 | 100915 161 86 951103 liss 318 185 9281 dioid) 17 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Summary Total OT Rating 100 110 125 Total NT No. Observations Average NT % Allowance Elemental No. Occurences Standard Time Total Standard Time (sum standard time for all elements): Foreign Elements Time Check H:M:S Allowance Summary Sym w W2 OT Description Finishing Time 8:11:45.6 Personal Needs 5 532 710 Left to get drink Starting Time 18:00:00.0 Basic Fatigue 2 B Elapsed Time 11:45.6 Variable Fatigue TEBS Special 2 D TEAF o Total Allowance % E Total Check Time Remarks: F Effective Time Time started at 00:00 G Ineffective Time Rating Check Total Recorded Time hundredths of mirates Synthetic Time Unaccounted Time % Observed Time Recording Error % Time in minutes, touths

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!