Question: 2. Evaluate the time study sheet below. All data in the OT columns are data that have been gathered using a snapback method. All times

2. Evaluate the time study sheet below. All data

2. Evaluate the time study sheet below. All data in the OT columns are data that have been gathered using a snapback method. All times are in seconds. The PFD allowance is 12%. Fill the table below and calculate the total ST. Element 1 Element 2 Element 3 Element 4 Cycle RW OT NTR WOT NT RW|OT|NTR WOT|NT 1007 ( 9 ( ) 11 ) 8 ( ) 111 ( ) 95 100 90 Total OT Rating Total NT No. Obs. Avg. NT %PFD ST 0.12 Total ST If the worker monitored in the time study above was expending 250 kcal/hr and was working in a factory with a wet-bulb globe temperature of 80 F, what would be the Atmospheric Condition allowance and new standard time for the task (assume this Atmospheric Condition allowance is not yet factored in the PFD above)? 2. Evaluate the time study sheet below. All data in the OT columns are data that have been gathered using a snapback method. All times are in seconds. The PFD allowance is 12%. Fill the table below and calculate the total ST. Element 1 Element 2 Element 3 Element 4 Cycle RW OT NTR WOT NT RW|OT|NTR WOT|NT 1007 ( 9 ( ) 11 ) 8 ( ) 111 ( ) 95 100 90 Total OT Rating Total NT No. Obs. Avg. NT %PFD ST 0.12 Total ST If the worker monitored in the time study above was expending 250 kcal/hr and was working in a factory with a wet-bulb globe temperature of 80 F, what would be the Atmospheric Condition allowance and new standard time for the task (assume this Atmospheric Condition allowance is not yet factored in the PFD above)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!