1) For the 28-day small project shown below, assume we have no resource problems or deadline...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
1) For the 28-day small project shown below, assume we have no resource problems or deadline constraints. Direct costs of all activities are shown in the table. Assume a period of 8 days. A (4) B (4) 4 (2) D (8) F (10) J (6) +5H 5 G (14) E (4) H (8) (8 K(10) Activity Develop the unbalanced bid budget for this project. A F H I J K Duration 4 4 8 4 10 14 8 6 6 10 Total = Direct Cost (S) 2,000 12,000 4,000 18,000 20,000 15,000 12,400 16,000 10,000 10,000 8,000 127,400 Indirect Cost Adjustments + 1.37% +2.67% +2.54% -1.43% -1.58% +0.96% +1.27% 0 -2.23% -2.23% -1.34% 0 Q2) Complete the overdraft calculations for the project in question 1 1) Assume a time period of 8 days, retainage amount is 10%, Contractor's optimum markup is 5%. 2) Indirect cost is $750/day. 3) Assume an unbalanced bid (to determine bid prices, distribute indirect costs in an unbalanced way among activities according to the adjustments shown in the table. The indirect costs of early activities are increased by a positive adjustment while indirect costs of later activities are decreased by a negative adjustment. The total bid price, however, does not change. 4) 50% of the contractor's expenses in any period are credited by suppliers, which will paid in the following period 5) All withheld retainage money will be paid back with the last payment Owner's payment delay of any invoice (payment certificate) is one period, for example, the first invoice will be submitted at the end of the first period and payment (approved invoice amount minus retainage amount) will take place at the end of the second period 6) A 20% mobilization payment is given to the contractor at the beginning of the project and will be deducted from the first two payments 1) For the 28-day small project shown below, assume we have no resource problems or deadline constraints. Direct costs of all activities are shown in the table. Assume a period of 8 days. A (4) B (4) 4 (2) D (8) F (10) J (6) +5H 5 G (14) E (4) H (8) (8 K(10) Activity Develop the unbalanced bid budget for this project. A F H I J K Duration 4 4 8 4 10 14 8 6 6 10 Total = Direct Cost (S) 2,000 12,000 4,000 18,000 20,000 15,000 12,400 16,000 10,000 10,000 8,000 127,400 Indirect Cost Adjustments + 1.37% +2.67% +2.54% -1.43% -1.58% +0.96% +1.27% 0 -2.23% -2.23% -1.34% 0 Q2) Complete the overdraft calculations for the project in question 1 1) Assume a time period of 8 days, retainage amount is 10%, Contractor's optimum markup is 5%. 2) Indirect cost is $750/day. 3) Assume an unbalanced bid (to determine bid prices, distribute indirect costs in an unbalanced way among activities according to the adjustments shown in the table. The indirect costs of early activities are increased by a positive adjustment while indirect costs of later activities are decreased by a negative adjustment. The total bid price, however, does not change. 4) 50% of the contractor's expenses in any period are credited by suppliers, which will paid in the following period 5) All withheld retainage money will be paid back with the last payment Owner's payment delay of any invoice (payment certificate) is one period, for example, the first invoice will be submitted at the end of the first period and payment (approved invoice amount minus retainage amount) will take place at the end of the second period 6) A 20% mobilization payment is given to the contractor at the beginning of the project and will be deducted from the first two payments
Expert Answer:
Related Book For
Financial Reporting Financial Statement Analysis and Valuation a strategic perspective
ISBN: 978-1337614689
9th edition
Authors: James M. Wahlen, Stephen P. Baginski, Mark Bradshaw
Posted Date:
Students also viewed these general management questions
-
The following additional information is available for the Dr. Ivan and Irene Incisor family from Chapters 1-5. Ivan's grandfather died and left a portfolio of municipal bonds. In 2012, they pay Ivan...
-
The following additional information is available for the Dr. Ivan and Irene Incisor family from Chapters 1-6. On December 12, Irene purchased the building where her store is located. She paid...
-
Builder Products, Incorporated, uses the weighted-average method in its process costing system. It manufactures a caulking compound that goes through three processing stages prior to completion....
-
Evaluate each following expression for x = 2, y = 5, and z = 3. 1. 8 + 3 2. 4yz + 2x 3. x + 5y - 4. 2y + 5z 5. y3 - z
-
(a) Explain the going concern assumption. (b) How does the going concern assumption support the use of the cost basis of accounting and the classification of assets and liabilities as current and...
-
How should any one of the airplanes described in Problem 2 fly in order to produce the maximum charge separation between its wing tips? (Consider both the direction of motion and the orientation of...
-
Atlantic Management Systems is a consulting firm that specializes in developing computerized decision support systems for computer manufacturing companies. The firm currently has offices in Chicago,...
-
14.An equi-concave lens of radius of curvature 15 cm and = 1.5 is placed in water (=1.33). If one surface is silvered, then image distance from lens when an object is placed at distance of 14 cm from...
-
A 200-pound steer can be sustained on a diet calling for various proportions of grass and grain. These combinations are shown in the table. Pounds of Grass Pounds of Grain 50 ..........80 56...
-
3A: Rewriting Equations with More Than One Variable 9. Solve for b. a' + b? = c Checkpoint #8B: Solving Problems by Writing Equations 10. Jorge has some dimes and quarters. He has 10 more dimes than...
-
The Race Track: Betting is closed. We have $1, 000 bet on horse A, $2, 000 on horse B, and $3, 000 on horse C. Compute the odds the track will post in order to take 10% no matter which horse wins. If...
-
A 65-year-old retiree expects to live for 20 more years, currently has $1,000,000, expects to earn a 8% rate per year on the investment, and expects inflation to average 3%. How much can the retiree...
-
Consider the two financing alternatives below for an $1,300,000 house purchase. Both loans are fully amortizing fixed rate mortgage with monthly payments. Alternative 1: Alternative 2: LTV = 90% LTV...
-
An all-equity firm is expected to have earnings per share in perpetuity of $6.00.The current price is $40.00 per share, which implies the equity capitalization rate ( r E ) is 15percent.Suppose the...
-
Set up a one-period binomial tree for a put option. Use the following information about the underlying stock price and the risk-free interest rate. What is the current value of the hedge portfolio?...
-
Find the boiling point temperature at 760 torr of an isomer of octane, C8H18, if its enthalpy of vaporization is 38,210 J mol-1 and its vapor pressure at 110.0C is 638.43 torr.
-
A spacecraft has left the earth and is moving toward Mars. An observer on the earth finds that, relative to measurements made when the spacecraft was at rest, its a. length is shorter b. KE is less...
-
Texas Instruments (TI) designs and manufactures semiconductor products for use in computers, telecommunications equipment, automobiles, and other electronics-based products. The manufacturing of...
-
Stebbins Corporation established a wholly owned Canadian subsidiary on January 1, Year 1, by contributing US$500,000 for all of the subsidiary's common stock. The exchange rate on that date was...
-
Exhibit 5.24 presents balance sheets for Year 2 and Year 3 for Whole Foods Market, Inc.; Exhibit 5.25 presents income statements for Year 1 through Year 3. REQUIRED a. For Year 3, prepare the...
-
A \(1.0-\mathrm{cm}\)-tall object is \(60 \mathrm{~cm}\) in front of a diverging lens that has a \(-30 \mathrm{~cm}\) focal length. Calculate the image position and height.
-
A 3.0-cm-tall object is \(15 \mathrm{~cm}\) in front of a convex mirror that has a \(-25 \mathrm{~cm}\) focal length. Calculate the image position and height.
-
A 3.0-cm-tall object is \(45 \mathrm{~cm}\) in front of a concave mirror that has a \(25 \mathrm{~cm}\) focal length. Calculate the image position and height.
Study smarter with the SolutionInn App