Question: 1 ) In the horizontal curve redesign example discussed in class ( Example 2 ) , consider the following scenario: [ 2 0 points ]

1) In the horizontal curve redesign example discussed in class (Example 2), consider the
following scenario: [20 points]
A steady rainfall has caused subsidence of the roadside slope, leaving only 8 feet from the edge
of the roadway. Based on this, you are required to:
a. Calculate the new (Ms).
b. Recalculate the SSD (Stopping Sight Distance).
c. Determine the new design speed that can be supported by the current conditions.
d. How much banking(superelevation) do you need to support this new design speed, or do
you need to increase e?
e. If the station of the PC is at 10+00, compute the station of the PT and the station of the PI
Note: \Delta =40\deg

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!