Question: 1 . Precedence relationships: Drawing the project network 2 . Determine cycle time ( the maximum time allowed at each work station ) 3 .

1.Precedence relationships: Drawing the project network
2.Determine cycle time (the maximum time allowed at each work station)
3.Calculate theoretical minimum number of workstations (Fraction are rounded to the next higher whole number)
4. Balance the line by assigning specific tasks to workstations
5. Calculating efficiency
 1.Precedence relationships: Drawing the project network 2.Determine cycle time (the maximum