Question: 1 . Setup for a stamping operation required a time - consuming fixture installation and testing that took 4 hours each time a different part
Setup for a stamping operation required a timeconsuming fixture installation and testing that took hours each time a different part was to be produced: typically, hours production was made for inventory of a given stamping before the machine was stopped to permit setup for a new part. After careful process analysis, fixtures and transfer methods were revised to permit setup in minutes. Discuss the implications for this change on a optimum batch size, b order frequency, and c machine and labor productivity.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock