Question: 1 SourceA 5 Factory B 1 C 2 Demand 120 Destination Assembly Plant 2 3 Supply 9 16 200 26400 8 7 200 620 60

1 SourceA 5 Factory B 1 C 2 Demand 120 Destination Assembly Plant 2 3 Supply 9 16 200 26400 8 7 200 620 60 What are the supply constraints for the factories? XA1 + XA2 + XA3 200 XB1 + XB2 + XB3 400 XC1 + XC2 + XC3 200 (These constraints could also have equality signs.) 29) (S) In setting up the an intermediate (transshipment) node constraint, assume that there are three sources, two intermediate nodes, and two destinations, and travel is possible between all sources and the intermediate nodes and between all intermediate nodes and all destinations for a given transshipment problem. In addition, assume that no travel is possible between source nodes, between intermediate nodes and between destination nodes and no direct travel from source nodes to destination nodes. Let the source nodes be labeled as 1, 2, and 3, the intermediate nodes be labeled as 4 and 5, and the destination nodes be labeled as 6 and 7. If there are 300 units available at source 2, state the constraint for source node 2.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!