Question: 1. Suppose that there are five PCs in the network and all five PC users are active only 10 percent of the time and is
1. Suppose that there are five PCs in the network and all five PC users are active only 10
percent of the time and is idle during the remaining 90 percent of the time. Also, suppose
that all PCs are powered on and connected to the Internet for 24 hours. Calculate how long
there are no available PCs resources for 24 hours. [2 points]
2. Consider a $3000 wafer having 30 cm diameter. This wafer will be chopped into dies that
are 0.7 cm on a side. [3 points]
a) How many dies can we produce?
b) If we assume a yield is 0.6, how many good dies can we produce?
c) How much does each die cost?
3. Consider the following set of processes, with the length of the CPU execution time given
in milliseconds. The processes are assumed to have arrived in the order P1, P2, P3, P4, at
the following times. [3 points]
Process Arrival Time Execution Time
---------------------------------------------------------------------------------
P1 0 6
P2 1 3
P3 3 4
P4 4 1
(a) Draw CPU grant chart that illustrates the execution of these processes using the FcFS,
SJF with non-preemptive, and SJF with preemptive scheduling, respectively.
(b) Calculate the average waiting time over all processes for FcFS, SJF with non-
preemptive, and SJF with preemptive.
4. Assume that we are going to replace the CPU in a computer with a faster version. This new
CPU is known providing 10 times faster on a computation in the floating point calculations
than the original CPU. The original CPU is currently busy with floating point calculations
50% of time and doing other calculations remaining 50 % of time. What is the overall
speedup gained by incorporating enhancement? [2 points]
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
