Question: 1. Task time estimates for the modification of an assembly line at Jim Goodales Carbondale, Illinois, factory are as follows: Activity Time (in hours) Immediate

1. Task time estimates for the modification of an assembly line at Jim Goodales Carbondale, Illinois, factory are as follows:

Activity

Time (in hours)

Immediate Predecessors

A

6

--

B

7

--

C

5

A

D

8

B, C

E

5

B, C

F

8

D

G

4

E, F

  1. Draw the project network using AON.
  2. Identify the critical path.
  3. What is the expected project length?
  4. Create a gantt chart for the project

2.Dave Fletcher was able to determine the activity times for constructing his laser scanning machine. Fletcher would like to determine ES, EF, LS, LF, and slack for each activity. The total project completion time and the critical path should also be determined. Here are the activity times:

Activity

Time (weeks)

Immediate Predecessor

ES

EF

LS

LF

Slack

A

6

--

B

5

--

C

3

A

D

4

A

E

4

B

F

7

B

G

6

C, E

H

5

D, F

3. Development of Version 2.0 of a particular accounting software product is being considered by Jose Nogueras technology firm in Baton Rouge. The activities necessary for the completion of this project are listed in the following table:

Activity

Normal Time (weeks)

Crash Time (weeks)

Normal Cost

Crash Cost

Immediate Predecessor(s)

A

5

4

$2,000

$2,700

--

B

2

1

2,200

2,600

--

C

3

3

500

500

--

D

7

3

2,300

2,700

A

E

6

3

900

1,350

B

F

4

3

3,000

3,600

C

G

4

2

1,400

1,800

D, E

  1. What is the length of project on normal time?
  2. What is the total cost required for completing this project on normal time?
  3. If you wish to reduce the time required to complete this project by 1 week, which activity should be crashed, and how much will this increase the total cost?
  4. What is the maximum time that can be crashed? How much would costs increase?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!