Question: 1) The configuration of scheduling parameters involves: 2) A work center is a place where production activities occur. True False 3) An MRP controller is

1) The configuration of scheduling parameters involves:

2) A work center is a place where production activities occur. True False

3) An MRP controller is assigned to a/an ______________ in the material master.

4) Production activity control involves __________ of the production order during the production process.

5) Field MRP type is maintained in which Material Master View.

6) Which of the following is NOT true for work centers?

7) At which stage does posting of finished goods to FI occurs?

8) Make-to-order is when the production order is related to a production plan that seeks to maintain a level of inventory deemed adequate to meet finished product demand.

9) Production schedulers are assigned to __________. Orders Production process Materials Work centers

10) The common set up for raw materials is that they are: Purchased externally Produced internally Both A and B Neither A or B

11) The material is manufactured according to a production order that specifies the quantity of the specific material to be produced in discrete production.

12) Storage locations identify areas within a plant where equipment (e.g., machines) is maintained and activities completed.

13) Which of the following represent a typical production process?

14) The production scheduling profile is created at the _________________ level and normally assigned to the material master

15) Under checking control, define checking control is to select:

16) Which is NOT the master data elements in production process? Work centers Bills of material Capacity Storage location All of the above are master data

17) The production version belongs to which type of order dependent parameter?

18) Which of the following is NOT true about planned and production order? Planned order authorizes production Planned order can be a result of the fulfillment process Production order can be created in reference to a planned order Production order can trigger a purchase requisition All of the above statements are NOT true.

19) Which of the following does not impact FI?

20) Which of the following activities does NOT impact CO? Goods issue Order settlement Production order Planned production Goods receipt

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!