Question: 1. The difference between the upper specification and the lower specification for a process is .70. The standard deviation is .15. Based on the given
1. The difference between the upper specification and the lower specification for a process is .70. The standard deviation is .15. Based on the given information, the process capability ratio, Cp= ___ (round your response to two decimal places).
2. Based on the process capability ratio Cp for the given information, one can say that the process is (Not very capable, barely capable, very much capable) to produce within the design specifications.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
