Question: 1. The following table gives the map coordinates and the shipping loads for a set of cities that we wish to connect through a central
1.
The following table gives the map coordinates and the shipping loads for a set of cities that we wish to connect through a central hub.
| City | Map Coordinates (x,y) | Shipping Load | |
| A | (5,12) | 5 | |
| B | (6,9) | 10 | |
| C | (5,9) | 15 | |
| D | (9,4) | 5 | |
| E | (6,7) | 15 | |
| F | (4,2) | 10 | |
| G | (3,5) | 6 | |
a) For the location of the proposed new central hub, the coordinates should be near:
x =
nothing
(round your response to two decimal places).
y =
nothing
(round your response to two decimal places).
b) If the shipments from city A
triple,
for the location of the proposed new central hub, the coordinates should be near:
x =
nothing
(round your response to two decimal places).
y =
nothing
(round your response to two decimal places).
2.
|
|
George Kyparisis makes bowling balls in his Miami plant. With recent increases in his costs, he has a newfound interest in efficiency. George is interested in determining the productivity of his organization. He would like to know if his organization is maintaining the manufacturing average of a 3% increase in productivity. He has the following data representing a month from last year and an equivalent month this year:
| Last Year | Now | |
| Units Produced | 1,200 | 1,200 |
| Labor (hours) | 300 | 275 |
| Resin (pounds) | 55 | 48 |
| Capital Invested ($) | 10,000 | 12,000 |
| Energy (BTU) | 3,000 | 2,850 |
The productivity change for each of the inputs (Labor, Resin, Capital, and Energy) is:
Labor Productivity Change =
nothing%
(enter your response as a percentage rounded to two decimal places and include a minus sign if necessary).Resin Productivity Change =
nothing%
(enter your response as a percentage rounded to two decimal places and include a minus sign if necessary).Capital Invested Productivity Change =
nothing%
(enter your response as a percentage rounded to two decimal places and include a minus sign if necessary).Energy Productivity Change =
nothing%
(enter your response as a percentage rounded to two decimal places and include a minus sign if necessary).
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
