Question: 1. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places.

 1. Using the ABC system, how much total manufacturing overhead cost

1. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.)

Total manufacturing overhead cost:________

2. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.)

Total overhead cost: Product Y________ % / Product Z_________%

3. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.)

Machining cost: Product Y________% / Product Z_________%

4. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.)

Machine setups cost: Product Y________% / Product Z_________%

5. Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and Product Z? (Round your answers to 2 decimal places.)

Product design cost: Product Y________% / Product Z_________%

6. Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z? (Round your intermediate calculations and final answers to 2 decimal places.)

General factory cost: Product Y________% / Product Z_________%

BRRRRRRRRRRRRRRRR Required information Greenwood Company manufactures two products15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number of setups Number of products Direct labor-hours Estimated Overhead Cost $ 216,700 $ 79,900 $ 81,000 $ 247,000 Expected Activity 11,000 MHS 170 setups 2 products 10,000 DLHS Activity Measure Machining Number of setups Number of products Direct labor-hours Product Y 7,700 60 Product z 3,300 110 7,700 2,300

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!