Question: Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round your intermediate calculations to 2 decimal places. Round
Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.)
Total manufacturing overhead cost=
2. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.)
Total manufacturing overhead cost=
3. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.)
Total overhead cost:
Product Y _____% =
Product Z _____%=
4. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to 2 decimal places.)
Machine setups cost:
Product Y ______%=
Product Z ______%=
5. Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and Product Z? (Round your answers to 2 decimal places.)
Product design cost:
Product Y _____%=
Product Z ______%=
6. Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z? (Round your intermediate calculations and final answers to 2 decimal places.)
General factory cost:
Product Y ____%=
Product Z ___%=
Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machining Number of setups Number of products Direct labor-hours Activity Measure Machine-hours Number of setups Number of products Direct labor-hours Estimated Overhead Cost $ 216,700 $ 79,900 $ 81,000 $ 247,000 Product Y Product Z 7,700 3,300 110 60 1 1 7,700 2,300 Expected Activity 11,000 MHS 170 setups 2 products 10,000 DLHS
Step by Step Solution
3.38 Rating (154 Votes )
There are 3 Steps involved in it
To answer these questions we need to allocate the manufacturing overhead costs to the two products based on activitybased costing ABC Well follow the ... View full answer
Get step-by-step solutions from verified subject matter experts
