Question: 1 View as TextDownload HW 7 / Sequencing Processes All parts arrive every ten minutes to a system having three cells ( or workstations )

1
View as TextDownload
HW7/Sequencing Processes
All parts arrive every ten minutes to a system having three cells (or workstations) A, B, and C,
the first part arrives at time 0, subsequent parts arrive at predicted delays (see below). There are
four part types, each with equal probability of arriving. The process times for the four part types
are given below. The process time parameters are for a triangular distribution (in minutes).
Part Type
Entity
Creation
(Delay)
Cell Process
Time
Cell Process
Time
Cell Process
Time
Part 10 A
6.3,9.1,12.5
C
7.9,13.2,18.5
Part 21 min A
9.1,13.9,19.1
B
8.6,15.4,21.2 C
4.7,8.7,12.3
Part 32 min A
8.9,11.2,14.6
B
5.4,9.2,12.7
Part 44 min B
9.9,13.2,16.8
C
8.1,10.9,13.8
Assume that the transfer time between each station is two minutes. Use the Sequence feature to
direct the parts through the system and to assign the processing times at each station. Use the Sets
feature to collect cycle times (total times in system) for each of the part types separately. Increase
each of your machine resource capacities to 4. Animate your model (including the part transfers)
and run the simulation for 2,400 minutes.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!