Question: 1 . We conduct a time study on a product using a stopwatch. We learn the overall average time to produce one item takes 2

1. We conduct a time study on a product using a stopwatch. We learn the overall average time to produce one item takes 2.5 minutes. The pace rating of the worker performing the job was 1.15. Time is added to the production rate for PD&F. The PD&F allowance for this process is 14%.
A. Determine the standard minutes