Question: 1) What size feeder is required by code that feeds (3) 5HP single phase 120V motors, a 10HP, 15HPand 25HP 3-phase/208V wound rotor motor and

1) What size feeder is required by code that feeds (3) 5HP single phase 120V motors, a 10HP, 15HPand 25HP 3-phase/208V wound rotor motor and a lighting load (120V) of 27,350va. The conduit for this feeder runs through a 42 C ambient area. Also, the owner requires an equipment grounding conductor run with this feeder, thus calculate the conduit size need for this feeder. Feeder Size Size EMT 1) What size feeder is required by code that feeds (3) 5HP single phase 120V motors, a 10HP, 15HPand 25HP 3-phase/208V wound rotor motor and a lighting load (120V) of 27,350va. The conduit for this feeder runs through a 42 C ambient area. Also, the owner requires an equipment grounding conductor run with this feeder, thus calculate the conduit size need for this feeder. Feeder Size Size EMT
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
