Question: 1 ) When driving large capacitive loads, the best way to size an inverter chain used as a buffer is ( select the best answer

1) When driving large capacitive loads, the best way to size an inverter chain used as a buffer is (select the best answer): [ Select ]["Exponential sizing", "Quadratic sizing", "Linear sizing", "None of these is correct.", "Geometric sizing"]
2) A unit inverter in a particular process has an input capacitance of 1 fF and a propagation delay of 10 ns. It is necessary to size an inverter chain to drive a load of 10 pF. Assume gamma of 1.
(a) What is the unbuffered (ie. one stage unit inverter) delay to drive this load?
(b) What is the best delay of a two stage buffer and what is the sizing ratio?
(c) What is the best delay of a three stage buffer and what are the inverter sizes?
(d) What is the optimum delay possible, how many stages are necessary and what are the sizes of the inverters in the chain?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Electrical Engineering Questions!