Question: 10 minutes per unit. Part 2 is simultaneously processed at workstation C for 20 minutes per unit. Workstations B and C feed the parts to

 10 minutes per unit. Part 2 is simultaneously processed at workstation

10 minutes per unit. Part 2 is simultaneously processed at workstation C for 20 minutes per unit. Workstations B and C feed the parts to an assembler at workstation D, where the two parts are assembled. The time at workstation D is 15 minutes. a) What is the bottleneck of this process? b) What is the hourly capacity of the process? -. \$7.15 A production process at Kenneth Day Manufacturing is shown in Figure S7.9. The drilling operation occurs separately from, and simultaneously with, sawing and sanding, which are independent and sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). a) Which operation is the bottleneck? b) What is the bottleneck time? c) What is the throughput time of the overall system? d) If the firm operates 8 hours per day, 20 days per month, what is the monthly capacity of the manufacturing process

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!