Question: 11. In _____, systems analysts use a prototype to verify user requirements, after which the prototype is discarded and implementation continues. a. system prototyping b.
| 11. In _____, systems analysts use a prototype to verify user requirements, after which the prototype is discarded and implementation continues.
|
| 12. The _____, which appears at the beginning of a report, identifies the report and contains the report title, date, and other necessary information.
|
| 13. A _____ usually causes specific actions, such as printing subtotals for a group of records in a report.
|
| 14. In a source document, the _____ contains any required signatures.
|
| 15. If variable input data is needed, a _____ must be provided to explain what is needed.
|
| 16. In older systems, often the user interface mainly consisted of _____ screens that allowed a user to send commands to the system.
|
| 17. A(n) _____ produces one or more lines of output for each record processed.
|
| 18. A(n) _____ is a data validation rule that is used to verify that data items fall between a specified minimum and maximum value.
|
| 19. Companies use various _____ methods to maintain output integrity and security.
|
| 20. The _____, which appears at the end of a report, can include grand totals for numeric fields and other end-of-report information.
|
|
|
| Identify the letter of the choice that best matches the phrase or definition.
|
| 21. When you reduce this, you avoid unnecessary labor costs, get data into the system more quickly, and decrease the number of errors. |
| 22. They are generally paper-based but can be provided online. |
| 23. This explains what is required on a form if variable input data is needed. |
| 24. It is a starting point with well-placed command buttons that allow users to navigate the system. |
| 25. It is especially important in designing large-scale systems because separate teams of analysts and programmers can work on different areas and then integrate the results. |
| 26. It can include grand totals for numeric fields and other end-of-report information. |
| 27. It identifies the report and contains the report title, date, and other necessary information. |
| 28. It produces an early, rapidly constructed working version of a proposed information system. |
| 29. It is a type of report that is useful when the user wants information only on records that might require action. |
| 30. It is a type of check that is used for mandatory data items. |
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
