Question: 11. Match the project delivery method with the description that best describes the delivery method. a. A+B b. Best Value c. Design-Build d. Design-Bid-Build e.

11. Match the project delivery method with the

11. Match the project delivery method with the description that best describes the delivery method. a. A+B b. Best Value c. Design-Build d. Design-Bid-Build e. Construction Manager (1)A project delivery method in which the designer and builder are the same entity. (2) _A bidding procedure that includes both price and time values. (3) _A procurement selection process where constructors are selected based upon a combination of factors representing what the owner considers to be most important. _A delivery process in which the constructor first acts as a consultant to the owner during the design phase, and later becomes the construction contractor during the construction phase. (5) _The traditional delivery method in which design is first performed, then constructor bids are received based upon the design. (4)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!