Question: 12%. Determine the stan 7. The observed element times and performance ratings collected in a direct time study are indicated in the table below. The

12%. Determine the stan 7. The observed element
12%. Determine the stan 7. The observed element times and performance ratings collected in a direct time study are indicated in the table below. The snapback timing method was used. The personal time, fatigue, and delay allowance in the plant is 14%. All elements are regular elements in the work cycle. Determine the standard time for the cycle. Work element b d Observed time (min) 0.22 0.41 0.30 0.37 Performance rating 90% 120% 100% 90% a