Question: 12 Problem 20 points Look at the 4 projects you want to evaluate the IRR of each project to get a rate of return. In

12 Problem 20 points Look at the 4 projects you want to evaluate the IRR of each project to get a rate of return. In order the results are 9.2% (W). 103% (X). 14,1% M, and 70% (z The betas are listed in order, .57 W). 77 (XI. 1.277, and 1.74 z). The Risk-free rate is 5%, and the expected return on the market is 12% Prime a. Which projects have a higher/lower expected return than the firm's 12% weighted average cost of capital (WACC)? expected retum, Project X has a Project W has a expected retum, and Project has a cxpected return. Project has a expected return b. Which projects should be accepted using the SML rule? Project should be Project Y should be Project X should be and Project Z should be