Question: 13. Arcane Co. budgets factory overhead (FO) cost split into three activities fabrication, assembly, and inspecting. Arcane plans to manufacture four products in the following
13. Arcane Co. budgets factory overhead (FO) cost split into three activities fabrication, assembly, and inspecting. Arcane plans to manufacture four products in the following quantities: A: 1,000 units; B: 900 units; C: 650 units; and D: 600 units. Determine the Budgeted Factory Overhead cost (Activity Cost Pool) for each of the three factory activities (make up your own numbers): Activity Cost Pool Activity Factory Overhead Cost Activity Base Fabrication S???? Direct Labor(DL) hours Assembly $???? Number of Parts Inspecting $???? Number of Inspections Total $????? ??? parts Determine activity-base usage (product specifications) for each of the four products (make up your own numbers): Activity B Fabrication ???? DL hrs. ???? DL hrs. ???? DL hrs. ???? DL hrs. Assembly ??? parts ??? parts ??? parts Inspecting ??? Insp. ??? Insp. ??? Insp ??? Insp Instructions: a) Determine your Budgeted Factory Overhead (FO) cost and Activity-base usage data in the format above (make up your own numbers). b) Calculate the Activity FO rates for each activity. Fab: Assembly: Insp.: c) Total Factory Overhead cost applied to "A" using Activity-Based Costing (ABC) : d) Total Factory Overhead cost applied to "B" using Activity-Based Costing (ABC) is: e) Total Factory Overhead cost applied to using Activity-Based Costing (ABC) : Total Factory Overhead cost applied to "D" using Activity-Based Costing (ABC) is
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts