Question: 14. Operational risk management (ORM) programs are designed to reduce risk to: A. The point at which the benefit exceeds the expense. B. A level

14. Operational risk management (ORM) programs
14. Operational risk management (ORM) programs are designed to reduce risk to: A. The point at which the benefit exceeds the expense. B. A level that is too small to be measurable. c. A rate of return that equals the current cost of capital. D. A level that the enterprise is willing to accepts. The correct answer is 15. Whether an operational risk from information systems has been reduced to an acceptable level should be determined by: A. IS requirements. B. Information security requirements. c. International standards. D. Organizational requirements. The correct answer is

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!