Question: . 14.12 Based on the data in Figure 14.13, complete a net material requirements schedule for: a) All items (10 schedules in all), assuming the

. 14.12 Based on the data in Figure 14.13,
. 14.12 Based on the data in Figure 14.13,
. 14.12 Based on the data in Figure 14.13,
. 14.12 Based on the data in Figure 14.13, complete a net material requirements schedule for: a) All items (10 schedules in all), assuming the requirement for b) All 10 items, assuming the requirement for all items is 1, except bi da a) b each BOM item is 1. B, C, and F, which require 2 each. Px 594 12 9 8 10 H 50 150 PERIOD Gross requirements: A Gross requirements: H 100 50 100 3 ON HAND LEAD TIME ON HAND LEAD TIME ITEM ITEM E F G G B C D E 0 100 50 50 75 1 2 2 1 2 F G H J K 75 75 0 100 100 2 1 1 2 2 Figure 14.13 Information for Problems 14.11 and 14.12 Information for Problem 14.10 Master Production Schedule for X1 PERIOD 7 8 9 10 11 Gross requirements 50 20 LEAD TIME ON HAND LEAD TIME ITEM ITEM X1 B1 B2 A1 1 2 2 1 50 20 20 5 D E 1 1 3 Figure 14.12

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!