Question: 15 points Save Awe A time study of an assembly operation yielded the following observed times for one element of the job, for which the

15 points Save Awe A time study of an assembly
15 points Save Awe A time study of an assembly operation yielded the following observed times for one element of the job, for which the analyst gave a performance rating of 1.13. Using an allowance of 20 percent, determine the appropriate standard time for this operation Observation Time minutes) 1.16 1.12 E.E.T. TTTT Paragraph : Arial 3(121) %DOQOFEED IT