Question: 15 TIME LEFT 02:22:36 For a home construction project, the project manager han determined that some deliverables in the work breakdown structure (WBS) do not

15 TIME LEFT 02:22:36 For a home construction project, the project manager han determined that some deliverables in the work breakdown structure (WBS) do not belong melaties because their scopes (although necessary are subordinate to the other liste description. Therefore, the project manager wildemon the subordinate descriptions to a lower level in the WBS Tierarchy Which three of the description in the WBS should be devoted? Choose 3 answers Inground swimming pool Shrubbery and flowers Landscaping products and installation Grass seed and fertilizer products Fixtures, appliances, and utilities Water and sewer connections