Question: 1a. An analyst has timed a metal-cutting task for 50 cycles. The average time per cycle was 10.40 minutes, and the standard deviation was 1.20

1a. An analyst has timed a metal-cutting task for 50 cycles. The average time per cycle was 10.40 minutes, and the standard deviation was 1.20 minutes for a worker with a performance rating of 125 percent. Assume an allowance of 16% of task time. Calculate the standard time for this task (10%) 1b. A task was timed for 60 cycles. It took an average of 1.2 minutes per cycle. The performance rating was 95%, and workday allowance is 10%. Determine each of the following: obse1a. An analyst has timed a metal-cutting task for 50 cycles. The average time per cycle was 10.40 minutes, and the standard deviation was 1.20 minutes for a worker with a performance rating of 125 percent. Assume an allowance of 16% of task time.

Calculate the standard time for this task (10%)

1b. A task was timed for 60 cycles. It took an average of 1.2 minutes per cycle. The performance rating was 95%, and workday allowance is 10%.

Determine each of the following: (10 Points)

a. Observed time.

b. Normal time.

c. Standard time.

1a. An analyst has timed a metal-cutting task for 50 cycles. The

1a. An analyst has timed a metal-cutting task for 50 cycles. The average time per cycle was 10.40 minutes, and the standard deviation was 1.20 minutes for a worker with a performance rating of 125 percent. Assume an allowance of 16% of task time. Calculate the standard time for this task (10%) 1b. A task was timed for 60 cycles. It took an average of 1.2 minutes per cycle. The performance rating was 95%, and workday allowance is 10% Determine each of the following: (10 Points) a. Observed time. b. Normal time. c. Standard time

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!