Question: 1.Every material flagged on this list will be planned (processed my MRP) in the next planning run. planning file consumption-based planning file reorder-point planning file
1.Every material flagged on this list will be planned (processed my MRP) in the next planning run.
planning file
consumption-based planning file
reorder-point planning file
automatic planning file
2. When using consumption-based planning, net requirements calculations are triggered by either an independent or dependent requirement.
True or False
3. Which MRP procedure is not supported in consumption-based planning?
lot-for-lot order policy planning
reorder point planning
forecast-based planning
time-phased planning
4. When using reorder point planning, a new order is generated by MRP when the stock level falls below the __________________.
reorder point
safety stock
order quantity
lot size
5. The reorder quantity and the safety stock quantity can be determined __________________.
automatically by the system
manually by the MRP controller
using best practices from industry
Both A and B
6. When using _______ reorder point planning, the reorder level and safety stock level are manually calculated and maintained.
Fill in the blank
7. When using _______ reorder point planning, the reorder level and safety stock level are determined automatically by the SAP forecasting program.
Fill in the blank
8. In reorder point planing, if the stock falls below the reorder level, the system will create a new order except when ____________________.
the supplier does not have capacity
an order already exists with sufficient quantity
the leat time is longer than time available
quality problems exist for the material
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts