Question: 1-In a Stopwatch Time Study, determine the standardized time for a job whose normal cycle time is 20 minutes. The performance rating is 80% and
1-In a Stopwatch Time Study, determine the standardized time for a job whose normal cycle time is 20 minutes. The performance rating is 80% and the allowance factor is 10%.
2-Consider the following data to calculate the ideal cycle time in designing a line balancing for a production line. They want to produce 60 units in one working day. There are 480 minutes available in a work day.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
