Question: ( 2 0 Points ) Based on the given work package ( Table 1 ) for the GAS STATION CONSTRUCTION project, please develop the 3

(20 Points) Based on the given work package (Table 1) for the "GAS STATION CONSTRUCTION" project, please develop the 3-levels WBS (figure 1).
Table 1. Work Packages for the Gas Station Construction Project
\table[[1. Interior Finishes,2. Painting],[3. Masony Bearing Walls,4. Walls or Shell],[5. Roof Gutters/Drainage,6. Interior Floor Covering],[7. Glazing,8. HVAC Systems],[9. Doors and Windows Install,10. Liehtming Systems],[11. Signage,12. Roof],[13. Built Up Roofing,14. Prefabricated Metal Panel Walls],[15. Asphalt Paving,16. Concrete Paving],[17. Foundations,18. Mechanical System Works],[19. Exterior Finishes,20. Brick Facade],[21. Water Systems,22. Earthwork],[23. Drwall Install,]]
c. There are uneven growth rates for both trip productions and attractions across TAZs.
Table 6.5 shows the expected trip production and attraction for each TAZ in 2025. Use|
the Doubly-Constrained Growth Factor method (also called Fratar method) to estimate
an OD matrix for 2025. Please show your results in Table 6-6.
Table 6-5: Expected production and attraction for each TAZ
Table 6-6: Estimated OD matrix
( 2 0 Points ) Based on the given work package (

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!