Question: [ 2 0 points ] You have been assigned as a staff geotechnical engineer for a project described below. The site is approximately 2 .
points You have been assigned as a staff geotechnical engineer for a project described below. The site is approximately acres in size. Currently, the site is being used as a parking lot. The planned new development for the site will add of fill SP or SM to the top of the site ie from the top of existing pavement The existing pavement and base course material will be removed and replaced with this fill. The unit weight for this material, when properly compacted to of ASTM D will be pcf
You have been provided with the following soil information:
Boring Bsee Figure
D Consolidation Test Results for the CL layer from a UD Sample taken at a depth of see Figure
ID Consolidation Test Results for the CL Layer from a UD Sample taken at a depth of see Figure
Soil Unit Weights summarized in Wible
Calculate the total consolidation settlement in the CL layers due to the addition of the of fill.
Table Summary of Soil Unit Weights from Boring B
tableDepth Range ftUCSC Symbol,pcf
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock