Question: 2 . 2 Field compaction control tests carried out at 4 site locations recorded the following values; Test 1 2 3 4 Vol ( cc

2.2 Field compaction control tests carried out at 4 site locations recorded the following values;
Test 1234
Vol (cc)946980957967
Wet mass (g)1777189219342087
Dry Mass (g)1551170516561780
If field compaction in-situ moisture content may vary by 2% above OR below the OMC value determined in Q2.1, and in-situ dry density must be at least 95%MDD as determined in Q2.1 above, determine which of the four field compaction control tests (1-4) meets specifications.
2 . 2 Field compaction control tests carried out

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!