Question: 2 4 points: You are building a bridge across a 4 0 ' low water crossing to serve a client. The bridge is to be
points: You are building a bridge across a low water crossing to serve a client. The bridge is to be feet wide, and must be able to support a full, yard concrete truck kips The bridge will be made of four, parallel, thickwalled, A steel pipes supported by fourfoot thick, wide and foot tall reinforced, concrete abutments at each end of the bridge. Assume uniform distribution of loadstress over the four pipes. Also assume the pipes will undergo only pure bending no torsion and the working stress of each pipe is ksi No middle support is desired. The bridge will be planked with treated posts and treated lumber. Show all work.
a Design the pipe size for this bridge exclude the contributions of planking. Note, you should use the attached Round HSS lookup Tables.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock