Question: 2. A company uses a continuous-review system, with optimal order quantity of 100 units. Annual demand for an item is normally distributed with a mean

2. A company uses a continuous-review system, with optimal order quantity of 100 units. Annual demand for an item is normally distributed with a mean 100 and standard deviation 200 . The reorder lead time is 0.5 month. It is desirable to set a service level such that there is an average of not more than one stockout a year. (a) What should be the level of safety stock? (b) What is the average waiting time for a customer? Do you think that the average waiting time is reasonable compared to the reorder lead time? (c) What should the safety stock be if it is desirable to set a service level to meet at least 90% of the units demanded during a typical lead time? (d) If the reorder lead time is normally distributed with a mean 0.5 and standard deviation 0.25 , how do the results in part (a) and (b) change, assuming that lead time demand is again normally distributed
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
