Question: 2. A task was timed at 65 cycles. On average, it took 1.10 minutes per cycle. The performance rating was 86 percent, and the workday
2. A task was timed at 65 cycles. On average, it took 1.10 minutes per cycle. The performance rating was 86 percent, and the workday allowance is 7.5 percent. Find the observed time, normal time, and standard time.(Do not round intermediate calculations (Round the final answers to 2 decimal places and calculations are needed for grading). Observation time = Average time =1.1 minutes Normal time = OT X performance rating =1.1 minutes 0.86=0.94 minutes AF=1+0.075=1.075ST=NTXAF=0.941.075=1.01minutes.