Question: 2 alternative pavement available for construction 9 0 0 0 m 2 of local roads as follows: concrete parement al - total initial cost =

2 alternative pavement available for construction 9000m2 of local roads as follows:
concrete parement al
-total initial cost =38 million
-rehabilitation in the 15th year (the cost of rehab of 1m2 concrete pavement is 1500)
asphalt pavement alt
-total initial cost =35 million
-first rehab in the 10th year (per 1m2 asphalt pavement:800)
-second rehab in the 20th year (per 1m2 asphalt pavement : 1200)
Analysis period =30 years.
Real discount rate =5%
User cost a residual value are similar for both alternatives.
Determine:
a.) Compare the alt. net present values (NPV) and indicate which one is better.
b.) Conduct a sensitivity analysis to verify whether the conclusion in part I holds for other smaller discount rates and explain the results.
2 alternative pavement available for construction

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!