Question: 2. As the Owner's project engineer you have a Preliminary Design completed by a small in-house staff. i-What level of design is needed to minimize

2. As the Owner's project engineer you have a

2. As the Owner's project engineer you have a Preliminary Design completed by a small in-house staff. i-What level of design is needed to minimize your risk of scope changes? Why? (5 points) ii-Once completed, what type of contract would you enter into for installation/construction to minimize the cost of scope overruns? Why? (5 points) iii-In addition to all Front-End documents, what are the tools/references you would use to control the project? Please list them. (5 points) iv-Would you apply contingency buried in the tasks or at the end of the Baseline schedule in your bid documents? Why? (5 points) v-Why are the task estimates referred to as budgets in MS Project? (5 points) Leads Lags -SS 2 -F8+1 I C E K B D -FF-4

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!