Question: 2. As the Owners project engineer you have a Preliminary Design completed by a small in-house staff. i-What level of design is needed to minimize
2. As the Owners project engineer you have a Preliminary Design completed by a small in-house staff.
i-What level of design is needed to minimize your risk of scope changes? Why? (5 points)
ii-Once completed, what type of contract would you enter into for installation/construction to minimize the cost of scope overruns? Why? (5 points)
iii-In addition to all Front-End documents, what are the tools/references you would use to control the project? Please list them. (5 points)
iv-Would you apply contingency buried in the tasks or at the end of the Baseline schedule in your bid documents? Why? (5 points)
v-Why are the task estimates referred to as budgets in MS Project? (5 points)