Question: 2. Break down the difference in cost from requirement 1-b above into a labour rate variance and a labour efficiency variance. (Indicate the effect of


2. Break down the difference in cost from requirement 1-b above into a labour rate variance and a labour efficiency variance. (Indicate the effect of each variance by selecting "F" for favourable, "U" for unfavourable, and "None" for no effect (i.e., zero variance).) Labour rate variance Labour efficiency variance 3. The budgeted variable manufacturing overhead rate is $2.00 per direct labour-hour. During July, the company incurred $19,872 in variable manufacturing overhead cost. Compute the variable overhead spending and efficiency variances for the month. (Indicate the effect of each variance by selecting "F" for favourable, "U" for unfavourable, and "None" for no effect (i.e., zero variance).) Variable overhead spending variance Variable overhead efficiency variance