Question: 2. Compute the overhead cost per unit for each product by using ABC. (Round rates and unit overhead costs to two decimal places.) Model A:

 2. Compute the overhead cost per unit for each product byusing ABC. (Round rates and unit overhead costs to two decimal places.)

2. Compute the overhead cost per unit for each product by using ABC. (Round rates and unit overhead costs to two decimal places.) Model A: overhead cost per unit Model B: overhead cost per unit Note: Be sure to complete both tables below. Activity Setups Inspections Driver Production runs Inspection hours Machine hours Maintenance hours Activity Rate per run $ per hour si per hour per hour Machining Maintenance Overhead assignment Model A 348,000 x Model B Setups Inspections Machining Maintenance Total overhead = Units produced Overhead per unit Feedback Check My Work Partially correct 3. Suppose that Ramsey decides to use departmental overhead rates. There are two departments: Department 1: (machine intensive) with a rate of $3 per machine hour and Department 2: (labor intensive) with a rate of s1 per direct labor hour. The consumption of these two drivers is as follows: Department 1 Department 2 Machine Hours Direct Labor Hours Model A 12,000 135,000 Model B 160,000 270,000 Compute the overhead cost per unit for each product by using departmental rates. (Round to two decimal places.) Model A: per unit Model B: per unit Cathy Plantwide versus Departmental Rates, Product-Costing Accuracy: Activity-Based Costing Ramsey Company produces speakers (Model A and Model B). Both products pass through two producing departments. Model A's production is much more labor-intensive than that of Model B. Model B is also the more popular of the two speakers. The following data has been gathered for the two products: Product Data Model A Model B Units produced per year 10,000 100,000 Prime costs $146,000 $1,460,000 Direct labor hours 139,000 320,000 Machine hours 23,000 202,000 Production runs 50 70 Inspection hours 700 1,100 10,000 90,000 Maintenance hours Overhead costs: Setup costs $348,000 Inspection costs 216,000 Machining 54,000 Maintenance 300,000 Total $918,000 Required

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!