Question: 2. Consider the job scheduling problem involving 8 operations on a single machine with a total of 2 end products. The sequencing of operation is

2. Consider the job scheduling problem involving 8 operations on a single machine with a total of 2 end products. The sequencing of operation is shown in the figure below. Let bj be the processing time for the jth operations. (j1 to 8). Delivery dates are restricted by d1 and d2 time units measured from the zero datum. Since each operation requires a special machine setup, it is assumed that any operation once started must be completed before a new operation can be undertaken
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
