Question: 2 - Consider two machines with two different instruction sets. Machine A has a 4 GHz clock and machine B has a 2 GHz clock.

 2 - Consider two machines with two different instruction sets. Machine

2 - Consider two machines with two different instruction sets. Machine A has a 4 GHz clock and machine B has a 2 GHz clock. The following measurements are recorded upon execution of a program. Machine A Instruction Class Load/Store 3 Arithmetic 8 Branch 7 Instruction Count (millions) CPI 5 9 1 Machine B Arithmetic Instruction Class Load/Store 6 Branch 5 2 Instruction Count (millions) CPI 3 8 1 2-(3 points) For Machine A what is the average CPI? 3-(3 points) For Machine B, what is the average CPI? 4-(4 points) What is the execution time for each machine and which is faster

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!