Question: A- For Machine A, what is the average CPI? B- For Machine B, what is the average CPI? C- What is the execution time for

A- For Machine A, what is the average CPI?
B- For Machine B, what is the average CPI?
C- What is the execution time for each machine and which is faster?
2 - Consider two machines with two different instruction sets. Machine A has a 4 GHz clock and machine B has a 2 GHz clock. The following measurements are recorded upon execution of a program. Machine A Arithmetic 8 Instruction Class Load/Store 3 Branch 7 Instruction Count (millions) CPI 5 9 1 Machine B Arithmetic Instruction Class Load/Store 6 Branch 5 2 Instruction Count (millions) CPI 3 8 8 1
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
