Question: 2. For the master production schedule in Problem-1, based on the BOM file and the routing and standard time data below, develop a capacity planning

2. For the master production schedule in
2. For the master production schedule in
2. For the master production schedule in Problem-1, based on the BOM file and the routing and standard time data below, develop a capacity planning for workcenters 1, 2, and 3 using the capacity bills method. (20 points) Product structure data: CC AM D D G BB HO D Routing and Standard Time Data: Lot Sizes Operation Work Center Standard Setup Standard Run Time Hours Hours per Unit End Products AA 50 WC1 10 0.3 1 of 1 1 of 1 BB 50 WC1 20 0.8 30 1 of 1 wci 12 CC Components D 50 WC2 5 0.2 1 of 1 1 of 2 E 60 WC1 3 0.05 100 2 of 2 4 F WC2 WC3 80 0.06 0.15 8 G 1 of 1 1 of 2 100 WC2 5 0.05 50 WC3 0.04 2 of 2 1 of 1 H 100 WC2 10 0.1 200 1 of 1 WC3 10 0.05 HOMEWORK-5 1. For the master production schedule and the information below, develop a capacity planning for workcenters 1, 2, and 3 using the CPOF method. (10 points) MPS Product Period-1 Period-2 Period-3 AA 6 7 6 BB 5 9 4 CC 8 7 Direct labor time per end product unit: Product Labor time AA 1 hr BB 2 hrs CC 3 hrs Historical percentages of total hours worked in each workcenter: Product Usage WC1 50% WC2 30% WC3 20%

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!